A fun day ahead, we are setting up to tar the pontoons on the house boat**, last thing to do before the big re-launch, messy stuff and we have some big ones to do, 50 feet long by 4 feet wide by 3 feet tall.
This stuff if anyone has never done it has a 2 hour work time as its an epoxy based system, big mess if not done right, so 6:50 AM here we have to go, everyone will be there at 7:30 to start, we don't want to do this in the heat of the day as it cures faster the hotter it is.
**Where I have been hiding out for the last few months, rebuilding the boat.